01

Know the operating load

Prepare a machinery list, starting load, normal operating load, future equipment and safety margin before choosing a factory.

02

Existing supply is not the whole answer

A listing may state the current Amp supply, but the available infrastructure, transformer arrangement, cable capacity, application process, cost and timing still require verification.

03

Questions to ask

Confirm the electrical position early in the property search.

  • Current approved supply
  • Previous maximum demand
  • Upgrade feasibility and estimated timeline
  • Transformer or substation arrangement
  • Who bears upgrade and reinstatement costs